Peak season in logistics: getting engineering cover lined up

Peak cover goes wrong when it is booked late. Here is how to work out the gap and line up engineers early.

Posted 31 October 2026

In peak, the sorter runs at full rate on nights and every trailer slot is booked. That is when a fault hurts most. If your one night fitter is already on another breakdown, the line waits.

Peak cover usually goes wrong because it gets booked late. Engineers are available in September. By the third week of November, many have gone to the sites that asked first.

For engineering, peak starts in October

Operations teams may say peak starts in mid-November. For the engineering team, it starts in October.

Volume goes up. Kit that runs two shifts runs three. The sorter, the shrink wrapper, the dock doors and the trucks all do more hours in six weeks than all summer. Small faults that were bearable in August turn into stops. A worn belt or a drifting photo eye may hold out at half rate. At full rate, on nights, it often fails.

Meanwhile your own team is thinner. Someone has holiday left over from the summer. Someone gets the winter bug. Those who remain are on more overtime than they would choose.

So the question for October is clear. What will you be short of, on which shifts, and who fills the gap?

Work out the gap on paper

Get the peak rota out and lay it next to the volume plan. Then go through it shift by shift.

For every shift in peak, ask:

  • who is on, and what can they fix alone
  • which machines will run hardest on that shift
  • what happens if that person is on a breakdown and a second machine stops
  • who can reach site within an hour if it goes wrong

Be clear about skills. A strong mechanical fitter on nights is great for chains, bearings and rollers. If the sorter throws a drive fault or an I/O card drops out, they may be stuck.

Then put a number on the risk. You should know your cost per hour of downtime. In peak it is higher. A stopped sorter means missed slots, late trailers and staff standing idle on double time. Work it out once, and deciding whether cover is worth paying for gets easier.

Book the cover early

Our view is that if peak is six weeks long, you book the extra engineer in October. Do not wait for the night the sorter stops.

There are two kinds of cover to line up. Many sites only arrange one.

Planned shift cover. This is an extra engineer on the nights you know will be hardest. Those are usually the weekends after Black Friday and the run into Christmas. Book engineers by name if you can. Get them in for a shift or two before peak, so they know the sorter and the panel layout.

Breakdown cover. This is someone to call at 2am when your own fitter is already busy. Agree it now. Know the rates and how long they take to reach site. Know who on your side can approve it.

If peak cover runs long, watch the calendar. The Agency Workers Regulations set a qualifying period. After 12 continuous calendar weeks* in the same role with the same hirer, an agency worker gets equal treatment on pay and conditions. An engineer who starts in early October and stays to January will pass that point. Our post on the 12-week rule explains how the weeks are counted.

Overtime has limits

The cheap answer is to ask your own team to do more. For one week, that can work. For six weeks, it wears people out.

The limits are set in law. Workers cannot work more than 48 hours a week* on average, unless they have opted out. The average is normally taken over 17 weeks*. Workers have a right to 11 hours' rest* between working days. They also have a right to 24 hours* without any work each week. An opt-out does not remove the safety risk.

HSE is clear on this. Long hours and badly designed shifts that leave no time to recover "can result in fatigue, accidents, injuries and ill health". A tired fitter on their sixth night shift is more likely to skip an isolation step to save time.

So use overtime for the gaps you did not plan for. Do not build peak around it.

Get the kit ready too

Cover is half the job. The other half is giving engineers less to fix.

Before peak, walk the line with your team. Pick the faults most likely to appear at full rate. Common ones include:

  • sorter belts and tilt trays
  • photo eyes on the merges
  • dock door and leveller hydraulics
  • shrink wrapper film carriages
  • truck batteries and chargers

Then sort your spares. For every machine that can stop the site, check the parts that fail most are on the shelf. Belts, sensors, contactors and fuses are a good start. If you run many of the same drive, keep a spare. A 2am breakdown with no part on the shelf can turn a one-hour job into a lost night.

Freeze anything that is not urgent. Avoid software updates on the sorter PLC in the middle of peak. Avoid extra jobs that turn a quick stop into a strip-down.

What to do this week

  • Lay the peak rota next to the volume plan. Mark every shift where one breakdown leaves nobody to cover a second.
  • Book named cover engineers for the hardest nights. Get them in for a shift before peak starts.
  • Agree a breakdown callout number, the rates and who can approve it. Put it on the board in the engineers' office.
  • Walk the sorter, docks and wrapper with your team. Fix or stock for the five faults most likely to stop you.

Next step

For peak cover on an automated warehouse site, see our temporary maintenance engineers page. You can also send us a brief or book a call. Our compliance team checks temporary engineers' right to work and documents.

*Correct on 7 October 2026.