When you go contract, someone will soon ask for your day rate. Many engineers answer with a rough number. It might be what a friend charges. It might be their old hourly rate times eight, with a bit on top.
If the answer comes back as a quick yes, take it as a warning. A day rate now has to pay for every day you do not work. It also has to cover everything your employer used to carry. An old payslip does not account for either.
Start with the days you will not bill
A year has 260 weekdays. You will not bill anything like that many.
Take off the bank holidays first. England and Wales has eight in 2027*. Then take off your own holiday. On staff, almost every worker gets 5.6 weeks' paid holiday*. That is 28 days* for a five-day week. An employer can count bank holidays as part of it. If you want the same time off as before, that is at least 28 days* gone.
Then count the rest:
- days off sick, with nobody paying you for them
- training days and ticket renewals
- admin days for invoices, quotes and your tax return
- gaps between jobs, which happen even to good engineers
Write your own figure down. Nobody else can pick it for you. It needs to be a true number, and it will be well under 260.
Then add the costs your employer used to carry
On staff, your employer spent money on you that never showed on your payslip. They paid at least 3%* into your pension. They bought your tools, PPE and insurance. They paid for your tickets.
Now you pay for all of it. List every cost as a yearly figure:
- public liability insurance, and any other cover sites ask for
- tools, meters, PPE and calibration
- van or car, fuel and parking
- tickets and training
- an accountant, and software for your records
- phone and laptop
- a pension, because nobody else is paying in
If you are self-employed, most of these are allowable expenses. GOV.UK gives an example. Turnover of £40,000 with £10,000 of allowable expenses means you only pay Income Tax on £30,000. That helps. The cost is still there.
Do the sum
Here is how to find your floor:
1. Decide what you need to take home in a year.
2. Add the tax on it. For 2026 to 2027, the Personal Allowance is £12,570*. Basic rate is 20%* up to £50,270*, then 40%*. If you are self-employed, Class 4 National Insurance is 6%* on profits between £12,570 and £50,270*. Above that it is 2%*.
3. Add your yearly costs.
4. Divide the total by your billable days.
The result is the least you can charge and still be as well off as on staff. Below it, you are paying to go to work.
Most engineers who run this sum for the first time get a figure well above what they have been quoting. Trust the sum.
Your floor is the lowest you go
Our view is that the floor is a number you never go under. The rate you quote is what the job is worth, and that is often higher.
A planned day shift on a line you know is one kind of job. A 2am breakdown on a servo you have never seen is much harder. Price nights, weekends and short-notice callouts higher, and say so up front. Set a minimum charge for callouts. Then a one-hour fix still covers the drive there and back.
Skills move the rate too. Controls and PLC work, drives and robots usually pay more than general mechanical work. Fewer engineers can do it. Our post on which tickets get you contract work covers what sites look for.
It helps to see it from the site's side. A stopped line costs the site far more per hour than you do. Managers who have worked out their downtime cost rarely haggle over a breakdown rate.
Agency work and direct work
Through an agency, check which rate you are being quoted. If you are paid through an umbrella company, the rate the agency pays is not your gross pay. Our guide to umbrella, limited or PAYE explains what comes off. Also know your rights. GOV.UK says recruitment agencies cannot charge you a fee for finding you work.
Working direct, you keep the full rate. You also carry the risk of not being paid. Watch the VAT threshold too. You must register if your taxable turnover for the last 12 months goes over £90,000*.
Put it in writing
A day rate means little until everyone agrees what a day is. Before you start, get these in writing:
- how many hours make a day, and what you charge after that
- rates for nights, weekends and bank holidays
- whether travel time and mileage are paid
- the callout minimum
- payment terms, and what happens if they are missed
If a business pays late, you can usually claim statutory interest. The rate is 8%* plus the Bank of England base rate, unless your contract sets a different rate.
What to do this week
- Count the days you will bill in the next 12 months. Put the number on paper.
- List every work cost you now pay yourself, as a yearly figure.
- Run the sum and find your floor. Do not quote under it again.
- Write a one-page rate card. Include your day, night, weekend and callout rates, travel and payment terms.
Next step
Search our jobs to see the contract and temporary work on offer. You can also register your CV. We will never send your CV to an employer without asking you first.
*Correct on 5 September 2026.