Maintech Recruitment 01543 212250 I’m hiring Upload CV
JobsFind workCV optimiserEmployersDisciplinesAdviceTeamContact Refer a friend Book a call I’m hiring Upload your CV

From mechanical fitter to multi-skilled: where to start

More line stops start in the panel now. Here is where a mechanical fitter can start on the electrical side, and in what order.

Posted 13 October 2026

Many fitters have waited for an electrician on a fault that turned out to be small. A chafed sensor cable is a common one. The machine was fine mechanically. The fitter suspected the sensor but was not sure how far to go.

More of the faults that stop a modern line are electrical now. An engineer who can follow a fault from the mechanics into the control circuit is in demand. In our view, that is also the engineer sites find hardest to hire.

Supervised time is the legal route

The law does not ask you to hold a certificate before you learn.

The Electricity at Work Regulations cover this in regulation 16. Nobody should do work that needs technical knowledge or experience to prevent danger unless they have it. The other option is the right level of supervision for the job. So the route to learning is written into the rule. You work under someone competent until you are competent yourself.

HSE's FAQs give a benchmark. A completed electrical apprenticeship, with some experience after it, "is a good way of demonstrating competence for general electrical work". Specialist work, such as control system modification, "is almost certainly likely to require additional training and experience".

That tells you two things. There is no shortcut to becoming a full electrician. You also do not need to be one to be useful on a machine's electrics. You need to know where your limit is.

Start with isolation

Most fitters want to learn PLCs first. We would start with something duller.

Learn safe isolation properly, on the kind of kit you work on. That means knowing which isolator and which lock to use. It means proving dead with an approved voltage indicator. It also means proving the tester before and after. Until you do that every time without thinking, nothing else on this list is safe to learn.

Then learn basic electrical theory until Ohm's law is second nature. You will use it every shift when you read a meter.

Then work outwards from the machine

After that, follow the faults you already see. On most lines, the order looks like this:

1. Sensors. Prox switches, photo-eyes and reed switches on cylinders. Learn PNP and NPN wiring. Learn to read the LED and test the supply and signal.

2. The 24V control circuit. Fuses, the power supply, relays and contactor coils. Most "nothing is happening" faults live here.

3. Drawings. Learn to follow a wire from the field device to the terminal, the card and the address. Once you can read drawings, you stop guessing.

4. The PLC, read only. Go online and watch the inputs change while someone runs the machine through a cycle. Change nothing. Learn to find the missing signal.

5. Drives. Read the fault log. Understand overcurrent and overvoltage trips. Learn which parameters you must never touch.

Each step builds on the one before. A fitter who is solid on steps one to three already fixes many faults that used to mean waiting for the electrician.

Ask your employer for training

If you are on staff, you do not have to fund all of this yourself.

The Management of Health and Safety at Work Regulations cover training in regulation 13. Employers must give adequate health and safety training when someone's responsibilities change. That training must take place during working hours. HSE's guidance on work equipment goes further. It says training "should take place during working hours and be at no cost to the employee".

So if your manager wants you to pick up electrical faults, that is a change of responsibilities. Ask in writing for the training and supervised time that go with it.

The case is easy to make. Every time a line waits for the one electrician on shift, the site loses output. A fitter who can find the chafed cable cuts that wait. The site is also less stuck when the electrician is off sick or on holiday.

Formal routes if you want the paper

Supervised time builds the skill. At some point you will also want a qualification.

The 18th Edition is the usual first ticket, because contract specs ask for it. It is an exam on the wiring regulations. Treat it as a way in the door. It does not prove you can fault-find. We cover it in is the 18th Edition worth it.

For a deeper route, look at a part-time HNC or an adult apprenticeship. If you are in England and paying for yourself, an Advanced Learner Loan can cover course fees. You must be 19 or older* on the first day of the course. The course must be at level 3, 4, 5 or 6* at an approved college or training provider. Level 4, 5 or 6 courses starting on or after 1 January 2027* move to the Lifelong Learning Entitlement instead. Ask the college which applies before you sign anything.

Know where you stop

The hardest part of going multi-skilled is saying "that's past me" with a shift manager watching.

Write your limit down. For example, sensors and control circuits are fine. Drive parameters are off limits. Safety circuits are only with a controls engineer. Then stick to it, even at 3am. Regulation 16 works both ways. It lets you learn under supervision. It also means you should not do work you are not competent for without it.

What to do this week

  • List the last ten breakdowns you worked on. Mark the ones that ended in the panel. That is your training plan.
  • Ask your electrician if you can shadow the next sensor or control circuit fault.
  • Ask your manager, in writing, for training to go with any electrical work you are given.
  • Practise proving dead, with the tester checked before and after, until it is habit.

Next step

When you are ready to move, search our maintenance engineer jobs or register your CV. Try our free CV optimiser before you apply.

*Correct on 11 September 2026.

Ready for your next role?

Register your CV once. We will call you about jobs that suit you.