An interview can go well and still miss the main question. A CV may list PLCs, drives and hydraulics. The engineer may talk through a gearbox change with ease. None of that proves they can fix your machine on a night shift.
Most of the time, nobody has lied. CVs often list kit the engineer has worked near. A chat does not test their hands. Without a test, you find out on a live breakdown.
What an interview does tell you
Keep the interview. A good chat shows you how someone thinks. Watch for these signs:
- they ask what the fault history says before they guess
- they talk about isolation without being prompted
- they say "I don't know, but here's how I'd find out"
An interview has limits, though. It cannot show how they read your drawings or find a fault on a panel. For that, you need them in front of the kit.
Good questions get closer. Our post on interview questions that show real skill has a list. Even so, a test lets you watch the work itself.
What the law expects
You do not have to trade test anyone. You do have to know what someone can do before you give them the job.
The Management of Health and Safety at Work Regulations cover this. Regulation 13 says an employer must "take into account their capabilities as regards health and safety" when giving people tasks. The code of practice for PUWER says maintenance work "should only be done by people who are competent to do the work".
HSE describes competence as "the combination of training, skills, experience and knowledge". It adds the ability to use them safely. A certificate shows the training. You have to see the rest.
Electrical work has a closer bar. The Electricity at Work Regulations set it out in regulation 16. Nobody should do work that needs technical knowledge or experience to prevent danger unless they have it. The other option is proper supervision. HSE's guidance lists what that knowledge covers. It includes "adequate understanding of the system to be worked on and practical experience of that class of system".
Note the words "that class of system". An electrician with ten years on domestic rewires is competent at domestic rewires. That says little about a 400V motor control centre.
Build the test from your own kit
A good trade test takes about an hour. Keep it close to the jobs the engineer will get. Use the same test for everyone going for the same job. Then you compare like with like.
Electrical
Take an old starter panel or a training rig. Put one fault in it, such as a blown control fuse or an open coil. Hand over the drawing and a meter, then watch. Do they isolate and prove dead before they put a hand in? Do they prove the tester on a known source first? Do they work from the drawing?
Mechanical
Set up a pump and motor on a baseplate, slightly out of line. Ask them to check it and say what they would do. Or use a gearbox with a worn bearing and a box of parts. Ask how they would get the bearing out. Ask what they would check before it goes back.
Fault-finding on paper
Give them a real alarm history from one of your machines and the month's fault log. Ask what they would look at first. A good engineer narrows the fault down step by step. You will hear it in how they talk.
Controls, if the job needs it
Provide a laptop, the right software and a copy of the program. Ask them to find why an output is not firing. Allow online access only, with no changes. If they go straight to forcing bits, that tells you something too.
Watch how they work
The right answer matters less than you might think. Plenty of good engineers miss a planted fault in an hour on strange kit. Watch the order they work in.
Good signs:
- they isolate before they open anything, without being asked
- they ask for the drawing, or ask what changed last
- they say what they are checking and why
- they stop and ask when they are not sure
Warning signs:
- they skip proving dead "because you told me it's off"
- they start swapping parts before they have found anything
- they cannot explain what they just did
The second list is the one that costs you. An engineer who swaps parts at random runs up your spares bill. The fault that keeps coming back will still be there.
Temporary and contract engineers
The same duty applies to an engineer you bring in for a shift. You still need to know they are competent for the task. A full trade test for one night of cover is not realistic. A short check is.
A good agency helps with part of this. At Maintech, our compliance team checks temporary engineers' right to work and documents. You still know your own kit best. So ask about the exact kit they have worked on, as well as their trade. Ask what they would do first on your fault. Then watch the first hour.
If someone is close but not quite there, the law gives another route. HSE's guidance on regulation 16 allows for "some degree of supervision" for people without enough knowledge or experience. That works on days with a senior engineer on site. It does not work on nights when the engineer is alone.
Our view
Run a trade test for every permanent hire. One hour on your kit tells you more than any amount of talk. A wrong hire costs a few months' wages. It also costs breakdowns that ran longer than they should. Against that, an hour of testing is cheap.
What to do this week
- Pick one electrical and one mechanical fault you can set up on spare kit. Write them down as your standard test.
- Write a short score sheet for how candidates work: isolation, method, explaining and asking.
- For every engineer already working nights alone, check you have seen them work on the kit they cover.
Next step
If you are hiring, send us a brief and tell us what kit the job covers. You can also book a call to talk it through. For cover on nights or breakdowns, see temporary maintenance engineers.
