When your best shift engineer hands in their notice, the first thought is usually money. What will it take to keep them? Slow down. The first conversation after a resignation matters more than the offer you make.
Ask why before you talk money
Most managers go straight to pay. They match the offer, add a bit and hope that settles it.
Sometimes that works. Often money is the reason they gave, and something else is the reason they are leaving. It might be months of covering an empty post. It might be a rota that has wrecked their weekends. It might be a breakdown where production stood over them for hours and nobody backed them up. It might be a training course that was promised and never came.
So ask, and then listen. Why now? What made you start looking? If you could change one thing here, what would it be?
Write the answers down. Even if they still leave, you learn what is pushing people out.
Should you counter?
Here is our view. A counter-offer on money alone rarely fixes the problem. It buys you time.
If the only reason is pay, and you have been paying below the market, fix the pay. But ask yourself why it took a resignation letter. Others on the team doing the same job will hear about the new rate within a week. If they are still on the old rate, you have shown them how to get a pay rise.
If the reason is the rota, the workload or how they are treated on breakdowns, more money will not hold them. They will take it and start looking again within the year.
The counter-offers that work fix the real reason for the whole team. Examples include:
- a second engineer on nights, so nobody works alone
- an on-call rota that is shared fairly
- pay brought up to the market for every engineer on the team
Our post on keeping good engineers when the site down the road pays more goes further.
If you cannot fix the reason, do not make the offer. Thank them and plan for them going.
What the notice period gives you
Check the contract, because that is where the notice period is set. By law, an employee who has been in the job for more than a month must give at least a week's notice*. Most engineering contracts ask for a month or more. Notice usually runs from the day after they hand it in.
A few other points from GOV.UK's guidance are worth knowing:
- Someone may resign in the "heat of the moment" and then change their mind. The employer can choose whether to accept the resignation. So a letter handed over after a bad night is not always final.
- You can put them on garden leave. They stay away from work for the notice period, on the same pay and contractual benefits.
- Their contract may have restrictive covenants. An example is a ban on working for a competitor for a time after they leave. Take advice before you rely on one.
Garden leave is rarely the right call for a maintenance engineer going to a site in another industry. You need them on the tools, passing on what they know.
Use every shift of the notice
If they are going, the notice period is the most useful month you will get from them. Use it.
Start with what only they know. Walk the site with them and a notebook. Which machines do they fix that nobody else does? What are the tricks? There might be a sensor that needs cleaning every week. There might be a drive that trips if you restart it too soon. There might be a panel where the drawings do not match the wiring.
Then get it written down:
1. a list of the machines they are the go-to person for
2. the repeat faults on each, and what fixes them
3. any changes they have made to PLC programs, with the backups saved and named
4. the suppliers and machine makers they ring, with numbers
Pair them with whoever will pick it up. Do this on live jobs, on normal shifts. If nobody on the team can pick it up, you have found a risk you did not know you had.
Check the PLC backups now, while they are still around to tell you which version is live. A program that only lives on their laptop leaves with them.
Plan the gap before it opens
Their last day will come, and the replacement will not be ready. Even if you start recruiting today, a new engineer has their own notice to work.
Look at the rota for the first eight weeks after they go. Which shifts lose the most skill? Book cover for those now. A contract engineer on the hardest shifts keeps the line covered. It also stops the rest of the team picking up the slack for months.
Leaving it costs more. The first big breakdown after they go can run all night. The person who would have fixed it in an hour now works somewhere else.
A short checklist
- If someone hands in notice, ask why before you mention money. Write the answers down.
- List what only they know, and book time on shift for them to hand it over.
- Check every PLC backup they look after is saved, named and easy for the team to find.
- Book cover for the shifts that lose the most skill when they go.
Next step
For cover during the gap, see our temporary maintenance engineers page. To recruit a permanent maintenance engineer, send us a brief or book a call. We call back within one working day.
*Correct on 11 October 2026.