Keeping good engineers when a nearby site pays more

A new site nearby pays more per hour, and you cannot always match it. Here is what makes good engineers stay anyway.

Posted 15 October 2026

A new site opens nearby. It offers days only, and more an hour than you pay. Your best electrician mentions it over a brew. Then they go quiet.

When a good engineer leaves, you lose more than a person. You lose the one who knows why the old sorter trips in the cold. You lose the person who wrote half the fault notes. And you still have to fill the job.

Pay matters, and it is rarely the whole story

Money counts. If you pay well below the area rate, you will lose people. Free pizza will not fix that. Find out where you stand first.

Then think about why an engineer starts looking. A pile of things usually builds up first. The pay rise elsewhere is what tips it.

The usual pile looks like this:

  • called in every other weekend because nobody else can do the job
  • the same machine failing every week, with no budget to fix it properly
  • spares that never arrive, so every repair is a bodge
  • a rota they had no say in
  • no training since the day they started
  • blame for downtime caused by a decision made in the office

Each one on its own is a grumble. Together, they are a reason to leave. A higher hourly rate somewhere else makes the move feel worth it.

Fix the things that cost little

Some of that pile is cheap to fix. Start there.

On-call

One person may carry the phone because nobody else can handle the faults. That is a skills problem dressed up as loyalty. Spread it. Train a second person on the kit that keeps dragging your best engineer back in.

Overtime

Look hard at how much you lean on overtime. HSE's guidance on fatigue has a line every maintenance manager should read. It says problems with overtime and shift-swapping "may indicate inadequate resource allocation and staffing levels". Put another way, if the rota only works because the same people keep saying yes, you are short.

Hours

The new site offers days. You may not be able to. You may still be able to offer something.

Since 6 April 2024, employees can ask for flexible working "from their first day in a job". That is from GOV.UK. You must deal with the request in a reasonable way. You must decide within 2 months*, unless you both agree to longer.

Do not wait for the letter. Ask your team what would make the pattern easier. A fixed weekend off each month might help. So might a later start, or a swap with someone who likes nights. Some of these cost you nothing.

Being listened to

Say your engineer warns that a gearbox needs replacing, and it fails three weeks later. They remember. So does everyone else. Give engineers a way to put their case. Then give them a straight answer, even if the answer is no.

Make the job worth staying for

The bigger levers cost money. They often cost less than losing someone.

Training is the one engineers mention most. An electrician who wants to learn PLCs will go where they can learn. If that is your site, they stay. Pick the courses that cut your downtime. Back the people who want them.

Then there is the kit. Engineers want to fix things properly. A site that runs on bodges wears good people down. Budget for the repairs that keep coming back. Your team will notice.

Last comes the pay itself. If you cannot match the hourly rate, look at the whole package. That means shift allowance, call-out pay, overtime rates, any tools allowance and holiday. Lay it out next to the other job. Sometimes the gap is smaller than the headline. Sometimes it is not. Then you need to decide if matching it costs less than replacing them.

Count what leaving costs

Most sites only see the cost of keeping someone. Count the other side too.

The job may sit open for weeks or months. The rest of the team covers on overtime and gets more tired. Breakdowns on that person's kit take longer, because the know-how left with them. Our post on why engineer vacancies sit open for months shows how a gap can drag on. Add those slower fixes at your own downtime cost per hour. The pay rise you did not give can start to look cheap.

If an engineer has already handed in their notice, a counter-offer can work. It rarely fixes the pile that made them look. We cover this in counter-offers and resignations.

Our view

Find out what the area pays and get close to it. Then fix the cheap things first. Spread the on-call and cut the overtime. Give people a say in their hours and a straight answer about the kit. Good engineers will often take a bit less to work at a site that runs well.

Steps to take this week

  • Ask each engineer, one to one, what would make the job easier. Write it down. Act on one thing for each person.
  • Count who has done the most call-outs and overtime in the last three months. If it is the same names, train a second person.
  • Check your rates, shift pay and call-out pay against two local adverts.

Next step

If you are short while you sort this out, temporary maintenance engineers can cover shifts. To talk through a hire, book a call or send us a brief.

*Correct on 17 September 2026.